Red River Floodway Floodway Expansion Project - Placement of Material in the Federal and Provincial Public Registries
Letter dated October 17, 2005 to Mr. Bruce Webb, Manitoba Conservation from Anthony J. Kettler, Infrastructure Canada, regarding the housing of written files for the provincial and federal registries. (pdf 56KB)
Provincial Public Registry Contact
Manitoba Conservation
Bruce Webb
ph: (204) 945-7021
fx: (204) 945-5229
email: bwebb@gov.mb.caFederal Public Registry Contact
Infrastructure Canada
Anthony Kettler
ph: (204) 983-3627
fx: (204) 983-2178
email: kettler.tony@infrastructure.gc.ca
The following material is available at the Main Registry, Conservation and Environment Library, Main Floor, 123 Main Street, Winnipeg: (ask for Public Registry File: 4967.00)
as of February 7, 2006
Construction Phase Environmental Protection Plans (CPEPP):
- CPEPP for Contract C1, East Gap, received July 8, 2005.
- CPEPP for Contract U1, Natural Gas Transmission Pressure Pipeline, received July 25, 2005.
- CPEPP for Contract U2, MTS Buried Conduit, received August 3, 2005.
- CPEPP for Contract T3, PTH 59 Crossover, received August 11, 2005.
- CPEPP for Contract I1, Inlet Control Structure Mechanical and Electrical Upgrades, received August 17, 2005.
- CPEPP for Contract T4, PTH 59 Bridge Replacement, received August 18, 2005.
- CPEPP for Contract T5, Trans Canada Highway Bridge Replacement, received September 8, 2005.
- CPEPP for Contract C2, Main Channel Excavation between Inlet and PTH 59, received September 20, 2005.
- CPEPP for Contract U4, Manitoba Hydro Fibre Optic Cable Installation, received October 21, 2005.
- CPEPP for Contract T8, CNR Sprague Bridge Temporary Detour Structure, received November 28, 2005.
- CPEPP for Contract T9, CNR Sprague Bridge Modifications, received December 23, 2005.