Red River Floodway Expansion Project - Notice of Project Alteration - December 2006
Table of Contents
Response to Questions (pdf 13KB)
Revised Table B1 Shear Stresses at Floodway Bridges (pdf 22KB)
Notice of Project Alteration Report, December 2006 (pdf 160KB)
Figures to Report:
- Figure 4.3-2 Flow Through Floodway Embankment Gaps for Design Flow (pdf 602KB)
- Figure 4.3-3 Flow Distribution Through Floodway Embankment Gaps (pdf 18KB)
- Figure 4.3-5 Stage-Discharge Relationships for Expanded Floodway Channel at Inlet (pdf 15KB)
- Figure 4.3-2(b) Flow Through Floodway Embankment Gaps for Design Flow 300 Year Flood (pdf 604KB)
- Figure 4.3-6 Water Surface Profiles for Expanded Floodway (pdf 30KB)
- Figure 5.3-4 Application of Floodway Operation Rules for Expanded Floodway (pdf 20KB)
- Figure 4.3-4 Floodway Channel Base Widths (pdf 22KB)
- Figure 1 - Floodway Construction Segments (pdf 693KB)
- Figure 5.4-8 Effect of Widening on Surface Water Infiltration at Dunning Road (pdf 178KB)
Appendix A Main Channel Excavation Plan and Sections (Drawings C4B) (pdf 352KB)